Risk Analysis
Author : John Halpin, Pratt and Whitney Canada
Description :

Describes typical risk management approaches, Pratt and Whitney Canada's risk management in their product development process, describes how complexity assessments measure level of difficulty of a proposed project and how using this approach ensures risk assessments are not techno centric. Part of a project portfolio management system. 

Author : Eric Delisle
Description :
Author : Matteo Giuliano, Kiewit Development
Description :
Author : Tom Sorel, Federal Highway Administration
Description :
Author : Dan Remollino, MTO; Storer Boone, Golder Associates
Description :
Title : RAVE Methodology (N/A | 2007 | #142)
Author :
Description : The RAVE methodology is focused on the team's "hot list" of the top seven-to-nine project risks.
Title : Building a Risk Reserve Program at Washington State DOT (Adobe Acrobat - ".pdf" | 2009 | MEMBER-ONLY | #285)
Author : Terry Berends
Description :

This presentation will cover how WSDOT changed the project management culture, from getting their project managers to just try using risk based estimating, into it being a common way of managing projects. Risk based estimating is a tool that supports risk management, without effective risk management you lose much of the benefits of risk based estimating. How to overcome the feeling that risk based estimating is just a flavor of the month. Lessons learned and best practices will be presented to prevent others from learning the hard way. What is needed to build a risk program within an organization and how do you keep it from being just another thing for project managers to do? Top ten reasons why to implement a risk program within your organization.

Programme: Building a Risk Reserve Program at Washington State DOT

Author : Alexandre Debs & René Donais
Description :

The Ministère des Transports du Québec (MTQ) is currently planning to renovate the Louis-Hyppolite Lafontaine bridge-tunnel in Montréal. The purpose of the project is to upgrade the tunnel’s safety level in the event of a fire to allow people to be evacuated by means of an emergency exit that complies with the standards applicable to road tunnels with an acceptable risk level for such infrastructures. The Ministère would like to determine the acceptable risk level based on a rigorous methodological process.

The project is currently at the feasibility analysis stage.  The project team members have performed a value analysis to ensure that the project will meet the stated needs cost-effectively while improving the bridge’s functionalities and reducing the risks and consequences of any incidents.

The originality of the proposed approach stems from the fusion of two established and internationally recognized methodologies: Value analysis and Risk analysis (or Specific Hazard Investigation).

The risk analysis was inspired by the booklet 4 of the Guide to road tunnel safety documentation.

This guide is intended to give the players involved a common understanding of the way in which these structures work, their environment and their action required in order to ensure safety.

This European method was developed in connection with a joint research project of the Organization for Economic Co-Operation and Development (OECD) and l’Association internationale permanente des congrès de la route (AIPCR) also called World Road Association (PIARC) with financial participation from the European Union. This method considers the tunnel as being a global system made up of users, the infrastructure itself with its equipment and environment, the operator, in addition to the intervention and emergency services. A function model (cornerstone of VA) was developed by the team. A disaster scenario was simulated and the tunnel’s performance evaluated for each function. The analysis revealed functions that need to be improved and a brainstorming session provided innovative solutions to improve user safety. A comparative analysis of scenarios made it possible to recommend a best possible scenario, i.e., the one that was the most cost-effective in meeting the stated needs.

Title : Risk Analysis as a Project Portfolio Tool (Adobe Acrobat - ".pdf" | 2009 | MEMBER-ONLY | #317)
Author : David Lewis
Description : Risk Analysis as a Portfolio Budgeting Tool
Title : Using a risk register tool to obtain best value (Adobe Acrobat - ".pdf" | 2009 | #326)
Author : Scot McClintock, Faithful + Gould
Description :
Author : Laszlo A. Retfalvi P.Eng. PMP
Description : The project manager is responsible for the overall cost of a project. The presentation will discuss the proper integration of Schedule Risk Analysis and Cost Risk Analysis techniques to offer the project manager powerful insight into not only schedule impacts but also the cost impacts of project risks.
Author : steVE Holmes
Description :
The Ontario Ministry of Transportation (MTO) leads Canadian agencies in the use of VA/VE/VM.  This presentation highlights why and how VE and Risk Analysis has been used on Ontario’s largest ever infrastructure projects. 
 
It is difficult for infrastructure owners to know if they have achieved value in large, technically complex (Mega) projects. Mega projects often have aggressive schedules and many constraints. Ontario has turned to using VE and Risk Analysis to systematically challenge the project assumptions and provide decision makers with the opportunity to consider alternatives to the proposed solution. The VE and Risk Analysis process results in Subject Matter Experts developing alternative designs that reflect the true constraints and project risks.

download full report here